summaryrefslogtreecommitdiff
path: root/Documentation
diff options
context:
space:
mode:
authorDmitry Shmidt <dimitrysh@google.com>2016-09-08 17:02:15 -0700
committerDmitry Shmidt <dimitrysh@google.com>2016-09-08 17:07:42 -0700
commit341e02d8bbeeda14cfc946ffbcb492dc9823487b (patch)
treea46f6c9f2483a7c3e64730b5dbde202dc2678efc /Documentation
parenta38338f1cd595f6a66870ba46cc6a4ae7378c084 (diff)
parent81330959ee15a682fbefcdd4f5350a979d8e8fdb (diff)
Merge remote-tracking branch 'linaro-ext/EAS/v4.4-easv5.2+aosp-changes' into android-4.4
Change-Id: Ic24b43ee867bc4f70b31bedaad734717b64b86a1
Diffstat (limited to 'Documentation')
-rw-r--r--Documentation/devicetree/bindings/scheduler/sched-energy-costs.txt360
-rw-r--r--Documentation/scheduler/sched-energy.txt362
-rw-r--r--Documentation/scheduler/sched-tune.txt366
3 files changed, 1088 insertions, 0 deletions
diff --git a/Documentation/devicetree/bindings/scheduler/sched-energy-costs.txt b/Documentation/devicetree/bindings/scheduler/sched-energy-costs.txt
new file mode 100644
index 000000000000..11216f09e596
--- /dev/null
+++ b/Documentation/devicetree/bindings/scheduler/sched-energy-costs.txt
@@ -0,0 +1,360 @@
+===========================================================
+Energy cost bindings for Energy Aware Scheduling
+===========================================================
+
+===========================================================
+1 - Introduction
+===========================================================
+
+This note specifies bindings required for energy-aware scheduling
+(EAS)[1]. Historically, the scheduler's primary objective has been
+performance. EAS aims to provide an alternative objective - energy
+efficiency. EAS relies on a simple platform energy cost model to
+guide scheduling decisions. The model only considers the CPU
+subsystem.
+
+This note is aligned with the definition of the layout of physical
+CPUs in the system as described in the ARM topology binding
+description [2]. The concept is applicable to any system so long as
+the cost model data is provided for those processing elements in
+that system's topology that EAS is required to service.
+
+Processing elements refer to hardware threads, CPUs and clusters of
+related CPUs in increasing order of hierarchy.
+
+EAS requires two key cost metrics - busy costs and idle costs. Busy
+costs comprise of a list of compute capacities for the processing
+element in question and the corresponding power consumption at that
+capacity. Idle costs comprise of a list of power consumption values
+for each idle state [C-state] that the processing element supports.
+For a detailed description of these metrics, their derivation and
+their use see [3].
+
+These cost metrics are required for processing elements in all
+scheduling domain levels that EAS is required to service.
+
+===========================================================
+2 - energy-costs node
+===========================================================
+
+Energy costs for the processing elements in scheduling domains that
+EAS is required to service are defined in the energy-costs node
+which acts as a container for the actual per processing element cost
+nodes. A single energy-costs node is required for a given system.
+
+- energy-costs node
+
+ Usage: Required
+
+ Description: The energy-costs node is a container node and
+ it's sub-nodes describe costs for each processing element at
+ all scheduling domain levels that EAS is required to
+ service.
+
+ Node name must be "energy-costs".
+
+ The energy-costs node's parent node must be the cpus node.
+
+ The energy-costs node's child nodes can be:
+
+ - one or more cost nodes.
+
+ Any other configuration is considered invalid.
+
+The energy-costs node can only contain a single type of child node
+whose bindings are described in paragraph 4.
+
+===========================================================
+3 - energy-costs node child nodes naming convention
+===========================================================
+
+energy-costs child nodes must follow a naming convention where the
+node name must be "thread-costN", "core-costN", "cluster-costN"
+depending on whether the costs in the node are for a thread, core or
+cluster. N (where N = {0, 1, ...}) is the node number and has no
+bearing to the OS' logical thread, core or cluster index.
+
+===========================================================
+4 - cost node bindings
+===========================================================
+
+Bindings for cost nodes are defined as follows:
+
+- cluster-cost node
+
+ Description: must be declared within an energy-costs node. A
+ system can contain multiple clusters and each cluster
+ serviced by EAS must have a corresponding cluster-costs
+ node.
+
+ The cluster-cost node name must be "cluster-costN" as
+ described in 3 above.
+
+ A cluster-cost node must be a leaf node with no children.
+
+ Properties for cluster-cost nodes are described in paragraph
+ 5 below.
+
+ Any other configuration is considered invalid.
+
+- core-cost node
+
+ Description: must be declared within an energy-costs node. A
+ system can contain multiple cores and each core serviced by
+ EAS must have a corresponding core-cost node.
+
+ The core-cost node name must be "core-costN" as described in
+ 3 above.
+
+ A core-cost node must be a leaf node with no children.
+
+ Properties for core-cost nodes are described in paragraph
+ 5 below.
+
+ Any other configuration is considered invalid.
+
+- thread-cost node
+
+ Description: must be declared within an energy-costs node. A
+ system can contain cores with multiple hardware threads and
+ each thread serviced by EAS must have a corresponding
+ thread-cost node.
+
+ The core-cost node name must be "core-costN" as described in
+ 3 above.
+
+ A core-cost node must be a leaf node with no children.
+
+ Properties for thread-cost nodes are described in paragraph
+ 5 below.
+
+ Any other configuration is considered invalid.
+
+===========================================================
+5 - Cost node properties
+==========================================================
+
+All cost node types must have only the following properties:
+
+- busy-cost-data
+
+ Usage: required
+ Value type: An array of 2-item tuples. Each item is of type
+ u32.
+ Definition: The first item in the tuple is the capacity
+ value as described in [3]. The second item in the tuple is
+ the energy cost value as described in [3].
+
+- idle-cost-data
+
+ Usage: required
+ Value type: An array of 1-item tuples. The item is of type
+ u32.
+ Definition: The item in the tuple is the energy cost value
+ as described in [3].
+
+===========================================================
+4 - Extensions to the cpu node
+===========================================================
+
+The cpu node is extended with a property that establishes the
+connection between the processing element represented by the cpu
+node and the cost-nodes associated with this processing element.
+
+The connection is expressed in line with the topological hierarchy
+that this processing element belongs to starting with the level in
+the hierarchy that this processing element itself belongs to through
+to the highest level that EAS is required to service. The
+connection cannot be sparse and must be contiguous from the
+processing element's level through to the highest desired level. The
+highest desired level must be the same for all processing elements.
+
+Example: Given that a cpu node may represent a thread that is a part
+of a core, this property may contain multiple elements which
+associate the thread with cost nodes describing the costs for the
+thread itself, the core the thread belongs to, the cluster the core
+belongs to and so on. The elements must be ordered from the lowest
+level nodes to the highest desired level that EAS must service. The
+highest desired level must be the same for all cpu nodes. The
+elements must not be sparse: there must be elements for the current
+thread, the next level of hierarchy (core) and so on without any
+'holes'.
+
+Example: Given that a cpu node may represent a core that is a part
+of a cluster of related cpus this property may contain multiple
+elements which associate the core with cost nodes describing the
+costs for the core itself, the cluster the core belongs to and so
+on. The elements must be ordered from the lowest level nodes to the
+highest desired level that EAS must service. The highest desired
+level must be the same for all cpu nodes. The elements must not be
+sparse: there must be elements for the current thread, the next
+level of hierarchy (core) and so on without any 'holes'.
+
+If the system comprises of hierarchical clusters of clusters, this
+property will contain multiple associations with the relevant number
+of cluster elements in hierarchical order.
+
+Property added to the cpu node:
+
+- sched-energy-costs
+
+ Usage: required
+ Value type: List of phandles
+ Definition: a list of phandles to specific cost nodes in the
+ energy-costs parent node that correspond to the processing
+ element represented by this cpu node in hierarchical order
+ of topology.
+
+ The order of phandles in the list is significant. The first
+ phandle is to the current processing element's own cost
+ node. Subsequent phandles are to higher hierarchical level
+ cost nodes up until the maximum level that EAS is to
+ service.
+
+ All cpu nodes must have the same highest level cost node.
+
+ The phandle list must not be sparsely populated with handles
+ to non-contiguous hierarchical levels. See commentary above
+ for clarity.
+
+ Any other configuration is invalid.
+
+===========================================================
+5 - Example dts
+===========================================================
+
+Example 1 (ARM 64-bit, 6-cpu system, two clusters of cpus, one
+cluster of 2 Cortex-A57 cpus, one cluster of 4 Cortex-A53 cpus):
+
+cpus {
+ #address-cells = <2>;
+ #size-cells = <0>;
+ .
+ .
+ .
+ A57_0: cpu@0 {
+ compatible = "arm,cortex-a57","arm,armv8";
+ reg = <0x0 0x0>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A57_L2>;
+ clocks = <&scpi_dvfs 0>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_0 &CLUSTER_COST_0>;
+ };
+
+ A57_1: cpu@1 {
+ compatible = "arm,cortex-a57","arm,armv8";
+ reg = <0x0 0x1>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A57_L2>;
+ clocks = <&scpi_dvfs 0>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_0 &CLUSTER_COST_0>;
+ };
+
+ A53_0: cpu@100 {
+ compatible = "arm,cortex-a53","arm,armv8";
+ reg = <0x0 0x100>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A53_L2>;
+ clocks = <&scpi_dvfs 1>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_1 &CLUSTER_COST_1>;
+ };
+
+ A53_1: cpu@101 {
+ compatible = "arm,cortex-a53","arm,armv8";
+ reg = <0x0 0x101>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A53_L2>;
+ clocks = <&scpi_dvfs 1>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_1 &CLUSTER_COST_1>;
+ };
+
+ A53_2: cpu@102 {
+ compatible = "arm,cortex-a53","arm,armv8";
+ reg = <0x0 0x102>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A53_L2>;
+ clocks = <&scpi_dvfs 1>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_1 &CLUSTER_COST_1>;
+ };
+
+ A53_3: cpu@103 {
+ compatible = "arm,cortex-a53","arm,armv8";
+ reg = <0x0 0x103>;
+ device_type = "cpu";
+ enable-method = "psci";
+ next-level-cache = <&A53_L2>;
+ clocks = <&scpi_dvfs 1>;
+ cpu-idle-states = <&CPU_SLEEP_0 &CLUSTER_SLEEP_0>;
+ sched-energy-costs = <&CPU_COST_1 &CLUSTER_COST_1>;
+ };
+
+ energy-costs {
+ CPU_COST_0: core-cost0 {
+ busy-cost-data = <
+ 417 168
+ 579 251
+ 744 359
+ 883 479
+ 1024 616
+ >;
+ idle-cost-data = <
+ 15
+ 0
+ >;
+ };
+ CPU_COST_1: core-cost1 {
+ busy-cost-data = <
+ 235 33
+ 302 46
+ 368 61
+ 406 76
+ 447 93
+ >;
+ idle-cost-data = <
+ 6
+ 0
+ >;
+ };
+ CLUSTER_COST_0: cluster-cost0 {
+ busy-cost-data = <
+ 417 24
+ 579 32
+ 744 43
+ 883 49
+ 1024 64
+ >;
+ idle-cost-data = <
+ 65
+ 24
+ >;
+ };
+ CLUSTER_COST_1: cluster-cost1 {
+ busy-cost-data = <
+ 235 26
+ 303 30
+ 368 39
+ 406 47
+ 447 57
+ >;
+ idle-cost-data = <
+ 56
+ 17
+ >;
+ };
+ };
+};
+
+===============================================================================
+[1] https://lkml.org/lkml/2015/5/12/728
+[2] Documentation/devicetree/bindings/topology.txt
+[3] Documentation/scheduler/sched-energy.txt
diff --git a/Documentation/scheduler/sched-energy.txt b/Documentation/scheduler/sched-energy.txt
new file mode 100644
index 000000000000..dab2f9088b33
--- /dev/null
+++ b/Documentation/scheduler/sched-energy.txt
@@ -0,0 +1,362 @@
+Energy cost model for energy-aware scheduling (EXPERIMENTAL)
+
+Introduction
+=============
+
+The basic energy model uses platform energy data stored in sched_group_energy
+data structures attached to the sched_groups in the sched_domain hierarchy. The
+energy cost model offers two functions that can be used to guide scheduling
+decisions:
+
+1. static unsigned int sched_group_energy(struct energy_env *eenv)
+2. static int energy_diff(struct energy_env *eenv)
+
+sched_group_energy() estimates the energy consumed by all cpus in a specific
+sched_group including any shared resources owned exclusively by this group of
+cpus. Resources shared with other cpus are excluded (e.g. later level caches).
+
+energy_diff() estimates the total energy impact of a utilization change. That
+is, adding, removing, or migrating utilization (tasks).
+
+Both functions use a struct energy_env to specify the scenario to be evaluated:
+
+ struct energy_env {
+ struct sched_group *sg_top;
+ struct sched_group *sg_cap;
+ int cap_idx;
+ int util_delta;
+ int src_cpu;
+ int dst_cpu;
+ int energy;
+ };
+
+sg_top: sched_group to be evaluated. Not used by energy_diff().
+
+sg_cap: sched_group covering the cpus in the same frequency domain. Set by
+sched_group_energy().
+
+cap_idx: Capacity state to be used for energy calculations. Set by
+find_new_capacity().
+
+util_delta: Amount of utilization to be added, removed, or migrated.
+
+src_cpu: Source cpu from where 'util_delta' utilization is removed. Should be
+-1 if no source (e.g. task wake-up).
+
+dst_cpu: Destination cpu where 'util_delta' utilization is added. Should be -1
+if utilization is removed (e.g. terminating tasks).
+
+energy: Result of sched_group_energy().
+
+The metric used to represent utilization is the actual per-entity running time
+averaged over time using a geometric series. Very similar to the existing
+per-entity load-tracking, but _not_ scaled by task priority and capped by the
+capacity of the cpu. The latter property does mean that utilization may
+underestimate the compute requirements for task on fully/over utilized cpus.
+The greatest potential for energy savings without affecting performance too much
+is scenarios where the system isn't fully utilized. If the system is deemed
+fully utilized load-balancing should be done with task load (includes task
+priority) instead in the interest of fairness and performance.
+
+
+Background and Terminology
+===========================
+
+To make it clear from the start:
+
+energy = [joule] (resource like a battery on powered devices)
+power = energy/time = [joule/second] = [watt]
+
+The goal of energy-aware scheduling is to minimize energy, while still getting
+the job done. That is, we want to maximize:
+
+ performance [inst/s]
+ --------------------
+ power [W]
+
+which is equivalent to minimizing:
+
+ energy [J]
+ -----------
+ instruction
+
+while still getting 'good' performance. It is essentially an alternative
+optimization objective to the current performance-only objective for the
+scheduler. This alternative considers two objectives: energy-efficiency and
+performance. Hence, there needs to be a user controllable knob to switch the
+objective. Since it is early days, this is currently a sched_feature
+(ENERGY_AWARE).
+
+The idea behind introducing an energy cost model is to allow the scheduler to
+evaluate the implications of its decisions rather than applying energy-saving
+techniques blindly that may only have positive effects on some platforms. At
+the same time, the energy cost model must be as simple as possible to minimize
+the scheduler latency impact.
+
+Platform topology
+------------------
+
+The system topology (cpus, caches, and NUMA information, not peripherals) is
+represented in the scheduler by the sched_domain hierarchy which has
+sched_groups attached at each level that covers one or more cpus (see
+sched-domains.txt for more details). To add energy awareness to the scheduler
+we need to consider power and frequency domains.
+
+Power domain:
+
+A power domain is a part of the system that can be powered on/off
+independently. Power domains are typically organized in a hierarchy where you
+may be able to power down just a cpu or a group of cpus along with any
+associated resources (e.g. shared caches). Powering up a cpu means that all
+power domains it is a part of in the hierarchy must be powered up. Hence, it is
+more expensive to power up the first cpu that belongs to a higher level power
+domain than powering up additional cpus in the same high level domain. Two
+level power domain hierarchy example:
+
+ Power source
+ +-------------------------------+----...
+per group PD G G
+ | +----------+ |
+ +--------+-------| Shared | (other groups)
+per-cpu PD G G | resource |
+ | | +----------+
+ +-------+ +-------+
+ | CPU 0 | | CPU 1 |
+ +-------+ +-------+
+
+Frequency domain:
+
+Frequency domains (P-states) typically cover the same group of cpus as one of
+the power domain levels. That is, there might be several smaller power domains
+sharing the same frequency (P-state) or there might be a power domain spanning
+multiple frequency domains.
+
+From a scheduling point of view there is no need to know the actual frequencies
+[Hz]. All the scheduler cares about is the compute capacity available at the
+current state (P-state) the cpu is in and any other available states. For that
+reason, and to also factor in any cpu micro-architecture differences, compute
+capacity scaling states are called 'capacity states' in this document. For SMP
+systems this is equivalent to P-states. For mixed micro-architecture systems
+(like ARM big.LITTLE) it is P-states scaled according to the micro-architecture
+performance relative to the other cpus in the system.
+
+Energy modelling:
+------------------
+
+Due to the hierarchical nature of the power domains, the most obvious way to
+model energy costs is therefore to associate power and energy costs with
+domains (groups of cpus). Energy costs of shared resources are associated with
+the group of cpus that share the resources, only the cost of powering the
+cpu itself and any private resources (e.g. private L1 caches) is associated
+with the per-cpu groups (lowest level).
+
+For example, for an SMP system with per-cpu power domains and a cluster level
+(group of cpus) power domain we get the overall energy costs to be:
+
+ energy = energy_cluster + n * energy_cpu
+
+where 'n' is the number of cpus powered up and energy_cluster is the cost paid
+as soon as any cpu in the cluster is powered up.
+
+The power and frequency domains can naturally be mapped onto the existing
+sched_domain hierarchy and sched_groups by adding the necessary data to the
+existing data structures.
+
+The energy model considers energy consumption from two contributors (shown in
+the illustration below):
+
+1. Busy energy: Energy consumed while a cpu and the higher level groups that it
+belongs to are busy running tasks. Busy energy is associated with the state of
+the cpu, not an event. The time the cpu spends in this state varies. Thus, the
+most obvious platform parameter for this contribution is busy power
+(energy/time).
+
+2. Idle energy: Energy consumed while a cpu and higher level groups that it
+belongs to are idle (in a C-state). Like busy energy, idle energy is associated
+with the state of the cpu. Thus, the platform parameter for this contribution
+is idle power (energy/time).
+
+Energy consumed during transitions from an idle-state (C-state) to a busy state
+(P-state) or going the other way is ignored by the model to simplify the energy
+model calculations.
+
+
+ Power
+ ^
+ | busy->idle idle->busy
+ | transition transition
+ |
+ | _ __
+ | / \ / \__________________
+ |______________/ \ /
+ | \ /
+ | Busy \ Idle / Busy
+ | low P-state \____________/ high P-state
+ |
+ +------------------------------------------------------------> time
+
+Busy |--------------| |-----------------|
+
+Wakeup |------| |------|
+
+Idle |------------|
+
+
+The basic algorithm
+====================
+
+The basic idea is to determine the total energy impact when utilization is
+added or removed by estimating the impact at each level in the sched_domain
+hierarchy starting from the bottom (sched_group contains just a single cpu).
+The energy cost comes from busy time (sched_group is awake because one or more
+cpus are busy) and idle time (in an idle-state). Energy model numbers account
+for energy costs associated with all cpus in the sched_group as a group.
+
+ for_each_domain(cpu, sd) {
+ sg = sched_group_of(cpu)
+ energy_before = curr_util(sg) * busy_power(sg)
+ + (1-curr_util(sg)) * idle_power(sg)
+ energy_after = new_util(sg) * busy_power(sg)
+ + (1-new_util(sg)) * idle_power(sg)
+ energy_diff += energy_before - energy_after
+
+ }
+
+ return energy_diff
+
+{curr, new}_util: The cpu utilization at the lowest level and the overall
+non-idle time for the entire group for higher levels. Utilization is in the
+range 0.0 to 1.0 in the pseudo-code.
+
+busy_power: The power consumption of the sched_group.
+
+idle_power: The power consumption of the sched_group when idle.
+
+Note: It is a fundamental assumption that the utilization is (roughly) scale
+invariant. Task utilization tracking factors in any frequency scaling and
+performance scaling differences due to difference cpu microarchitectures such
+that task utilization can be used across the entire system.
+
+
+Platform energy data
+=====================
+
+struct sched_group_energy can be attached to sched_groups in the sched_domain
+hierarchy and has the following members:
+
+cap_states:
+ List of struct capacity_state representing the supported capacity states
+ (P-states). struct capacity_state has two members: cap and power, which
+ represents the compute capacity and the busy_power of the state. The
+ list must be ordered by capacity low->high.
+
+nr_cap_states:
+ Number of capacity states in cap_states list.
+
+idle_states:
+ List of struct idle_state containing idle_state power cost for each
+ idle-state supported by the system orderd by shallowest state first.
+ All states must be included at all level in the hierarchy, i.e. a
+ sched_group spanning just a single cpu must also include coupled
+ idle-states (cluster states). In addition to the cpuidle idle-states,
+ the list must also contain an entry for the idling using the arch
+ default idle (arch_idle_cpu()). Despite this state may not be a true
+ hardware idle-state it is considered the shallowest idle-state in the
+ energy model and must be the first entry. cpus may enter this state
+ (possibly 'active idling') if cpuidle decides not enter a cpuidle
+ idle-state. Default idle may not be used when cpuidle is enabled.
+ In this case, it should just be a copy of the first cpuidle idle-state.
+
+nr_idle_states:
+ Number of idle states in idle_states list.
+
+There are no unit requirements for the energy cost data. Data can be normalized
+with any reference, however, the normalization must be consistent across all
+energy cost data. That is, one bogo-joule/watt must be the same quantity for
+data, but we don't care what it is.
+
+A recipe for platform characterization
+=======================================
+
+Obtaining the actual model data for a particular platform requires some way of
+measuring power/energy. There isn't a tool to help with this (yet). This
+section provides a recipe for use as reference. It covers the steps used to
+characterize the ARM TC2 development platform. This sort of measurements is
+expected to be done anyway when tuning cpuidle and cpufreq for a given
+platform.
+
+The energy model needs two types of data (struct sched_group_energy holds
+these) for each sched_group where energy costs should be taken into account:
+
+1. Capacity state information
+
+A list containing the compute capacity and power consumption when fully
+utilized attributed to the group as a whole for each available capacity state.
+At the lowest level (group contains just a single cpu) this is the power of the
+cpu alone without including power consumed by resources shared with other cpus.
+It basically needs to fit the basic modelling approach described in "Background
+and Terminology" section:
+
+ energy_system = energy_shared + n * energy_cpu
+
+for a system containing 'n' busy cpus. Only 'energy_cpu' should be included at
+the lowest level. 'energy_shared' is included at the next level which
+represents the group of cpus among which the resources are shared.
+
+This model is, of course, a simplification of reality. Thus, power/energy
+attributions might not always exactly represent how the hardware is designed.
+Also, busy power is likely to depend on the workload. It is therefore
+recommended to use a representative mix of workloads when characterizing the
+capacity states.
+
+If the group has no capacity scaling support, the list will contain a single
+state where power is the busy power attributed to the group. The capacity
+should be set to a default value (1024).
+
+When frequency domains include multiple power domains, the group representing
+the frequency domain and all child groups share capacity states. This must be
+indicated by setting the SD_SHARE_CAP_STATES sched_domain flag. All groups at
+all levels that share the capacity state must have the list of capacity states
+with the power set to the contribution of the individual group.
+
+2. Idle power information
+
+Stored in the idle_states list. The power number is the group idle power
+consumption in each idle state as well when the group is idle but has not
+entered an idle-state ('active idle' as mentioned earlier). Due to the way the
+energy model is defined, the idle power of the deepest group idle state can
+alternatively be accounted for in the parent group busy power. In that case the
+group idle state power values are offset such that the idle power of the
+deepest state is zero. It is less intuitive, but it is easier to measure as
+idle power consumed by the group and the busy/idle power of the parent group
+cannot be distinguished without per group measurement points.
+
+Measuring capacity states and idle power:
+
+The capacity states' capacity and power can be estimated by running a benchmark
+workload at each available capacity state. By restricting the benchmark to run
+on subsets of cpus it is possible to extrapolate the power consumption of
+shared resources.
+
+ARM TC2 has two clusters of two and three cpus respectively. Each cluster has a
+shared L2 cache. TC2 has on-chip energy counters per cluster. Running a
+benchmark workload on just one cpu in a cluster means that power is consumed in
+the cluster (higher level group) and a single cpu (lowest level group). Adding
+another benchmark task to another cpu increases the power consumption by the
+amount consumed by the additional cpu. Hence, it is possible to extrapolate the
+cluster busy power.
+
+For platforms that don't have energy counters or equivalent instrumentation
+built-in, it may be possible to use an external DAQ to acquire similar data.
+
+If the benchmark includes some performance score (for example sysbench cpu
+benchmark), this can be used to record the compute capacity.
+
+Measuring idle power requires insight into the idle state implementation on the
+particular platform. Specifically, if the platform has coupled idle-states (or
+package states). To measure non-coupled per-cpu idle-states it is necessary to
+keep one cpu busy to keep any shared resources alive to isolate the idle power
+of the cpu from idle/busy power of the shared resources. The cpu can be tricked
+into different per-cpu idle states by disabling the other states. Based on
+various combinations of measurements with specific cpus busy and disabling
+idle-states it is possible to extrapolate the idle-state power.
diff --git a/Documentation/scheduler/sched-tune.txt b/Documentation/scheduler/sched-tune.txt
new file mode 100644
index 000000000000..9bd2231c01b1
--- /dev/null
+++ b/Documentation/scheduler/sched-tune.txt
@@ -0,0 +1,366 @@
+ Central, scheduler-driven, power-performance control
+ (EXPERIMENTAL)
+
+Abstract
+========
+
+The topic of a single simple power-performance tunable, that is wholly
+scheduler centric, and has well defined and predictable properties has come up
+on several occasions in the past [1,2]. With techniques such as a scheduler
+driven DVFS [3], we now have a good framework for implementing such a tunable.
+This document describes the overall ideas behind its design and implementation.
+
+
+Table of Contents
+=================
+
+1. Motivation
+2. Introduction
+3. Signal Boosting Strategy
+4. OPP selection using boosted CPU utilization
+5. Per task group boosting
+6. Question and Answers
+ - What about "auto" mode?
+ - What about boosting on a congested system?
+ - How CPUs are boosted when we have tasks with multiple boost values?
+7. References
+
+
+1. Motivation
+=============
+
+Sched-DVFS [3] is a new event-driven cpufreq governor which allows the
+scheduler to select the optimal DVFS operating point (OPP) for running a task
+allocated to a CPU. The introduction of sched-DVFS enables running workloads at
+the most energy efficient OPPs.
+
+However, sometimes it may be desired to intentionally boost the performance of
+a workload even if that could imply a reasonable increase in energy
+consumption. For example, in order to reduce the response time of a task, we
+may want to run the task at a higher OPP than the one that is actually required
+by it's CPU bandwidth demand.
+
+This last requirement is especially important if we consider that one of the
+main goals of the sched-DVFS component is to replace all currently available
+CPUFreq policies. Since sched-DVFS is event based, as opposed to the sampling
+driven governors we currently have, it is already more responsive at selecting
+the optimal OPP to run tasks allocated to a CPU. However, just tracking the
+actual task load demand may not be enough from a performance standpoint. For
+example, it is not possible to get behaviors similar to those provided by the
+"performance" and "interactive" CPUFreq governors.
+
+This document describes an implementation of a tunable, stacked on top of the
+sched-DVFS which extends its functionality to support task performance
+boosting.
+
+By "performance boosting" we mean the reduction of the time required to
+complete a task activation, i.e. the time elapsed from a task wakeup to its
+next deactivation (e.g. because it goes back to sleep or it terminates). For
+example, if we consider a simple periodic task which executes the same workload
+for 5[s] every 20[s] while running at a certain OPP, a boosted execution of
+that task must complete each of its activations in less than 5[s].
+
+A previous attempt [5] to introduce such a boosting feature has not been
+successful mainly because of the complexity of the proposed solution. The
+approach described in this document exposes a single simple interface to
+user-space. This single tunable knob allows the tuning of system wide
+scheduler behaviours ranging from energy efficiency at one end through to
+incremental performance boosting at the other end. This first tunable affects
+all tasks. However, a more advanced extension of the concept is also provided
+which uses CGroups to boost the performance of only selected tasks while using
+the energy efficient default for all others.
+
+The rest of this document introduces in more details the proposed solution
+which has been named SchedTune.
+
+
+2. Introduction
+===============
+
+SchedTune exposes a simple user-space interface with a single power-performance
+tunable:
+
+ /proc/sys/kernel/sched_cfs_boost
+
+This permits expressing a boost value as an integer in the range [0..100].
+
+A value of 0 (default) configures the CFS scheduler for maximum energy
+efficiency. This means that sched-DVFS runs the tasks at the minimum OPP
+required to satisfy their workload demand.
+A value of 100 configures scheduler for maximum performance, which translates
+to the selection of the maximum OPP on that CPU.
+
+The range between 0 and 100 can be set to satisfy other scenarios suitably. For
+example to satisfy interactive response or depending on other system events
+(battery level etc).
+
+A CGroup based extension is also provided, which permits further user-space
+defined task classification to tune the scheduler for different goals depending
+on the specific nature of the task, e.g. background vs interactive vs
+low-priority.
+
+The overall design of the SchedTune module is built on top of "Per-Entity Load
+Tracking" (PELT) signals and sched-DVFS by introducing a bias on the Operating
+Performance Point (OPP) selection.
+Each time a task is allocated on a CPU, sched-DVFS has the opportunity to tune
+the operating frequency of that CPU to better match the workload demand. The
+selection of the actual OPP being activated is influenced by the global boost
+value, or the boost value for the task CGroup when in use.
+
+This simple biasing approach leverages existing frameworks, which means minimal
+modifications to the scheduler, and yet it allows to achieve a range of
+different behaviours all from a single simple tunable knob.
+The only new concept introduced is that of signal boosting.
+
+
+3. Signal Boosting Strategy
+===========================
+
+The whole PELT machinery works based on the value of a few load tracking signals
+which basically track the CPU bandwidth requirements for tasks and the capacity
+of CPUs. The basic idea behind the SchedTune knob is to artificially inflate
+some of these load tracking signals to make a task or RQ appears more demanding
+that it actually is.
+
+Which signals have to be inflated depends on the specific "consumer". However,
+independently from the specific (signal, consumer) pair, it is important to
+define a simple and possibly consistent strategy for the concept of boosting a
+signal.
+
+A boosting strategy defines how the "abstract" user-space defined
+sched_cfs_boost value is translated into an internal "margin" value to be added
+to a signal to get its inflated value:
+
+ margin := boosting_strategy(sched_cfs_boost, signal)
+ boosted_signal := signal + margin
+
+Different boosting strategies were identified and analyzed before selecting the
+one found to be most effective.
+
+Signal Proportional Compensation (SPC)
+--------------------------------------
+
+In this boosting strategy the sched_cfs_boost value is used to compute a
+margin which is proportional to the complement of the original signal.
+When a signal has a maximum possible value, its complement is defined as
+the delta from the actual value and its possible maximum.
+
+Since the tunable implementation uses signals which have SCHED_LOAD_SCALE as
+the maximum possible value, the margin becomes:
+
+ margin := sched_cfs_boost * (SCHED_LOAD_SCALE - signal)
+
+Using this boosting strategy:
+- a 100% sched_cfs_boost means that the signal is scaled to the maximum value
+- each value in the range of sched_cfs_boost effectively inflates the signal in
+ question by a quantity which is proportional to the maximum value.
+
+For example, by applying the SPC boosting strategy to the selection of the OPP
+to run a task it is possible to achieve these behaviors:
+
+- 0% boosting: run the task at the minimum OPP required by its workload
+- 100% boosting: run the task at the maximum OPP available for the CPU
+- 50% boosting: run at the half-way OPP between minimum and maximum
+
+Which means that, at 50% boosting, a task will be scheduled to run at half of
+the maximum theoretically achievable performance on the specific target
+platform.
+
+A graphical representation of an SPC boosted signal is represented in the
+following figure where:
+ a) "-" represents the original signal
+ b) "b" represents a 50% boosted signal
+ c) "p" represents a 100% boosted signal
+
+
+ ^
+ | SCHED_LOAD_SCALE
+ +-----------------------------------------------------------------+
+ |pppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppp
+ |
+ | boosted_signal
+ | bbbbbbbbbbbbbbbbbbbbbbbb
+ |
+ | original signal
+ | bbbbbbbbbbbbbbbbbbbbbbbb+----------------------+
+ | |
+ |bbbbbbbbbbbbbbbbbb |
+ | |
+ | |
+ | |
+ | +-----------------------+
+ | |
+ | |
+ | |
+ |------------------+
+ |
+ |
+ +----------------------------------------------------------------------->
+
+The plot above shows a ramped load signal (titled 'original_signal') and it's
+boosted equivalent. For each step of the original signal the boosted signal
+corresponding to a 50% boost is midway from the original signal and the upper
+bound. Boosting by 100% generates a boosted signal which is always saturated to
+the upper bound.
+
+
+4. OPP selection using boosted CPU utilization
+==============================================
+
+It is worth calling out that the implementation does not introduce any new load
+signals. Instead, it provides an API to tune existing signals. This tuning is
+done on demand and only in scheduler code paths where it is sensible to do so.
+The new API calls are defined to return either the default signal or a boosted
+one, depending on the value of sched_cfs_boost. This is a clean an non invasive
+modification of the existing existing code paths.
+
+The signal representing a CPU's utilization is boosted according to the
+previously described SPC boosting strategy. To sched-DVFS, this allows a CPU
+(ie CFS run-queue) to appear more used then it actually is.
+
+Thus, with the sched_cfs_boost enabled we have the following main functions to
+get the current utilization of a CPU:
+
+ cpu_util()
+ boosted_cpu_util()
+
+The new boosted_cpu_util() is similar to the first but returns a boosted
+utilization signal which is a function of the sched_cfs_boost value.
+
+This function is used in the CFS scheduler code paths where sched-DVFS needs to
+decide the OPP to run a CPU at.
+For example, this allows selecting the highest OPP for a CPU which has
+the boost value set to 100%.
+
+
+5. Per task group boosting
+==========================
+
+The availability of a single knob which is used to boost all tasks in the
+system is certainly a simple solution but it quite likely doesn't fit many
+utilization scenarios, especially in the mobile device space.
+
+For example, on battery powered devices there usually are many background
+services which are long running and need energy efficient scheduling. On the
+other hand, some applications are more performance sensitive and require an
+interactive response and/or maximum performance, regardless of the energy cost.
+To better service such scenarios, the SchedTune implementation has an extension
+that provides a more fine grained boosting interface.
+
+A new CGroup controller, namely "schedtune", could be enabled which allows to
+defined and configure task groups with different boosting values.
+Tasks that require special performance can be put into separate CGroups.
+The value of the boost associated with the tasks in this group can be specified
+using a single knob exposed by the CGroup controller:
+
+ schedtune.boost
+
+This knob allows the definition of a boost value that is to be used for
+SPC boosting of all tasks attached to this group.
+
+The current schedtune controller implementation is really simple and has these
+main characteristics:
+
+ 1) It is only possible to create 1 level depth hierarchies
+
+ The root control groups define the system-wide boost value to be applied
+ by default to all tasks. Its direct subgroups are named "boost groups" and
+ they define the boost value for specific set of tasks.
+ Further nested subgroups are not allowed since they do not have a sensible
+ meaning from a user-space standpoint.
+
+ 2) It is possible to define only a limited number of "boost groups"
+
+ This number is defined at compile time and by default configured to 16.
+ This is a design decision motivated by two main reasons:
+ a) In a real system we do not expect utilization scenarios with more then few
+ boost groups. For example, a reasonable collection of groups could be
+ just "background", "interactive" and "performance".
+ b) It simplifies the implementation considerably, especially for the code
+ which has to compute the per CPU boosting once there are multiple
+ RUNNABLE tasks with different boost values.
+
+Such a simple design should allow servicing the main utilization scenarios identified
+so far. It provides a simple interface which can be used to manage the
+power-performance of all tasks or only selected tasks.
+Moreover, this interface can be easily integrated by user-space run-times (e.g.
+Android, ChromeOS) to implement a QoS solution for task boosting based on tasks
+classification, which has been a long standing requirement.
+
+Setup and usage
+---------------
+
+0. Use a kernel with CGROUP_SCHEDTUNE support enabled
+
+1. Check that the "schedtune" CGroup controller is available:
+
+ root@linaro-nano:~# cat /proc/cgroups
+ #subsys_name hierarchy num_cgroups enabled
+ cpuset 0 1 1
+ cpu 0 1 1
+ schedtune 0 1 1
+
+2. Mount a tmpfs to create the CGroups mount point (Optional)
+
+ root@linaro-nano:~# sudo mount -t tmpfs cgroups /sys/fs/cgroup
+
+3. Mount the "schedtune" controller
+
+ root@linaro-nano:~# mkdir /sys/fs/cgroup/stune
+ root@linaro-nano:~# sudo mount -t cgroup -o schedtune stune /sys/fs/cgroup/stune
+
+4. Setup the system-wide boost value (Optional)
+
+ If not configured the root control group has a 0% boost value, which
+ basically disables boosting for all tasks in the system thus running in
+ an energy-efficient mode.
+
+ root@linaro-nano:~# echo $SYSBOOST > /sys/fs/cgroup/stune/schedtune.boost
+
+5. Create task groups and configure their specific boost value (Optional)
+
+ For example here we create a "performance" boost group configure to boost
+ all its tasks to 100%
+
+ root@linaro-nano:~# mkdir /sys/fs/cgroup/stune/performance
+ root@linaro-nano:~# echo 100 > /sys/fs/cgroup/stune/performance/schedtune.boost
+
+6. Move tasks into the boost group
+
+ For example, the following moves the tasks with PID $TASKPID (and all its
+ threads) into the "performance" boost group.
+
+ root@linaro-nano:~# echo "TASKPID > /sys/fs/cgroup/stune/performance/cgroup.procs
+
+This simple configuration allows only the threads of the $TASKPID task to run,
+when needed, at the highest OPP in the most capable CPU of the system.
+
+
+6. Question and Answers
+=======================
+
+What about "auto" mode?
+-----------------------
+
+The 'auto' mode as described in [5] can be implemented by interfacing SchedTune
+with some suitable user-space element. This element could use the exposed
+system-wide or cgroup based interface.
+
+How are multiple groups of tasks with different boost values managed?
+---------------------------------------------------------------------
+
+The current SchedTune implementation keeps track of the boosted RUNNABLE tasks
+on a CPU. Once sched-DVFS selects the OPP to run a CPU at, the CPU utilization
+is boosted with a value which is the maximum of the boost values of the
+currently RUNNABLE tasks in its RQ.
+
+This allows sched-DVFS to boost a CPU only while there are boosted tasks ready
+to run and switch back to the energy efficient mode as soon as the last boosted
+task is dequeued.
+
+
+7. References
+=============
+[1] http://lwn.net/Articles/552889
+[2] http://lkml.org/lkml/2012/5/18/91
+[3] http://lkml.org/lkml/2015/6/26/620